Construction
The following guidelines, checklists and forms are in pdf format so that you may read and/or print them out for your use.
If you have any questions, please do not hesitate to ask.
FORMS & CHECKLISTS
Construction Portal

Please CLICK HERE [10] to access our new portal for Constrution Permits
Please CLICK HERE [11] to schedule your inspection online today!
Provide your name, contact phone number,
Permit number, type of inspection Example: Building, Electric, Fire.
Description of inspection request Example: Rough, Final, Service, etc.
REQUIREMENTS
| Elevating Structures [12] | Residential Stair Requirements [13] |
| Requirements for Demolition [14] | Required Inspections [15] |
COAH
| COAH Information [16] | COAH Residential Form [17] |
| COAH Non-Residential Form [18] |
Helpful Links:
FLOOD DEVELOPMENT PERMIT REQUIREMENT
Ordinance No. 09-38
19-4.1 Floodplain Development Permit.
A Floodplain Development Permit shall be obtained before any construction or development begins within any Special Flood Hazard Area established in subsection 19-3.2. Click here for the application. The application must demonstrate compliance with all applicable requirements. Submissions may be required to include, but not be limited to; plans drawn to scale showing the nature, location, dimensions, elevations and materials of the structures or area in question; existing or proposed structures, fill, storage of materials, drainage facilities; and the location of the foregoing.
Specifically, the following information is required:
a. Elevation in relation to mean sea level, of the lowest floor (including crawl space or basement) of all structures;
b. Elevation in relation to mean sea level to which any structure has been floodproofed;
c. Certification by a registered professional engineer or architect that the floodproofing methods for any nonresidential structure meet the floodproofing criteria in subsection 19-5.2b;
d. Description of the extent to which any watercourse will be altered or relocated as a result of proposed development;
e. Openings in enclosures below the Design Flood Elevation; and
f. Building materials used below the Design Flood Elevation.
Floodplain Development Permit
CLICK HERE [27]
CONSTRUCTION DEPARTMENT CONTACT INFORMATION
Ext. 263
SUBCODE OFFICIALS:
Dean Ferraro [29] Ext. 268
Building Subcode Official
Plumbing Subcode Official
Mechanical Inspector
Bryant Curry [31]Ext. 268
Fire Subcode
Donald Clare [28] Ext. 263
Electrical Subcode
CONSTRUCTION DEPARTMENT OFFICE STAFF:
To contact the construction office via email, CLICK HERE [32]
|
Janet Silvestri [32] Ext. 261 |
|
|
|
|
